What Could Replace the Former Evergreen Way Walmart? Rowan Park’s 248 Homes

The former Walmart at 11400 Evergreen Way is difficult to miss. What was once a 149,000-square-foot big-box store and a sea of parking has sat vacant since the store closed in 2023, leaving one of South Everett’s larger commercial properties waiting for a second life.
Now the site could change almost completely. Pacific Ridge–DRH, an affiliate of D.R. Horton, has applied to turn the roughly 19-acre property into Rowan Park, a 248-home neighborhood made up of townhomes and detached houses. Everett planning staff is recommending approval with conditions, but the project is not final yet. A public hearing before the City’s Hearing Examiner is scheduled for November 5, and the examiner will make the land-use decision after that process.
If approved and built substantially as proposed, Rowan Park would replace one of the most recognizable vacant retail sites on Evergreen Way with something much closer to a compact residential neighborhood.
248 Homes Instead of One Big-Box Store
The current proposal calls for 156 townhomes and 92 detached homes. That mix is notable because Rowan Park is not being designed as a conventional apartment complex or a subdivision of large detached houses. It sits somewhere in between: small-lot ownership housing with a combination of attached and detached units.
The site itself covers about 18.9 acres. After accounting for critical areas and their buffers, Everett staff identifies roughly 17 acres as net developable area. That is enough space for a fairly dense neighborhood while still leaving room for internal drives, yards, landscaping, drainage facilities, pedestrian routes, and recreation areas.
The contrast with the former use is significant. The Walmart site was designed around one enormous building and surface parking. Rowan Park would divide that land into hundreds of individual residential lots and common areas, changing not only what happens on the property but how people move through it.
The Homes Would Be Organized Around Private Drives, Not New Public Streets
The current plan does not create a traditional grid of new public streets. Instead, Rowan Park would use a network of private drives to reach the homes and carry utilities through the development.
Everett staff says the proposal includes pedestrian pathways connecting individual homes to common open spaces and to the public sidewalk along Evergreen Way. The homes are also planned with attached garages, with additional guest parking distributed through the site.
That distinction may affect how the finished neighborhood feels. A private-drive subdivision can create a more enclosed residential environment than a site divided by conventional city streets, but the City is still requiring public-access easements and pedestrian improvements along the primary internal routes. Staff’s recommended conditions call for separated sidewalks and crosswalks on the main access drives connecting toward Evergreen Way, 112th Street SW, and a potential future connection in the direction of Airport Road.
There Would Be More Than 50,000 Square Feet of Additional Open Space
Rowan Park is dense compared with many older detached-home neighborhoods, but the current site plan also includes more than 50,000 square feet of additional open space and recreation area beyond the private or shared yards required for the individual homes.
That matters because the proposal is trying to convert a property that currently has very little usable outdoor space into a place where hundreds of households would actually live. The former Walmart parking lot could absorb cars easily, but residential development needs a different mix of landscaping, pedestrian space, drainage, play or recreation areas, and private outdoor space.
The final landscaping still has work to go through during permitting. City staff has already identified revisions needed to parts of the preliminary landscape plan, which is a good reminder that the subdivision concept and the final construction plans are not the same thing.
Swamp Creek Is Part of the Site’s History
The western side of the property has an environmental story that predates Rowan Park.
When the Walmart was developed in the 2000s, part of Swamp Creek was relocated and a previously piped stream segment was daylighted. Habitat improvements and native planting were required as part of that earlier project. More recent environmental review found the stream and enhanced buffer to be well established.
Rowan Park’s current proposal does not call for further intrusion into the established critical areas or buffers. That is important because the usable development area is partly shaped by those protected portions of the property.
This is a useful real-world example of the issue we recently covered in Does Your Property Have a Critical Area?. A property can be large on paper while streams, wetlands, slopes, drainage areas, and buffers determine how much of it is actually available for development.
The Environmental Review Has Already Reached an Important Milestone
Everett issued a Determination of Nonsignificance for Rowan Park on October 22. In practical terms, the City determined through its State Environmental Policy Act review that the proposal, with applicable regulations and conditions, does not require a full environmental impact statement.
That does not mean the project has received final subdivision approval or that construction can begin immediately. Rowan Park still has to move through the Hearing Examiner process, final subdivision review, site-work permitting, individual building permits, landscaping revisions, utility work, and other conditions.
But it does mean one of the major early environmental-review steps has been completed.
The November 5 Hearing Is the Next Big Step
As of November 3, the most immediate milestone is the public hearing scheduled for Thursday, November 5 at 10 a.m. Everett is holding the hearing virtually through Microsoft Teams.
Planning staff has recommended that the Hearing Examiner approve the 248-lot subdivision with conditions. Because the project contains more than 50 lots, however, the Hearing Examiner — not planning staff alone — makes the final land-use decision on the preliminary subdivision.
That is why “proposed” still matters in the headline. Rowan Park has moved substantially beyond a speculative concept, but it has not yet crossed the point where homeowners should treat every element of the plan as guaranteed.
The Site Is Zoned for Much More Intense Development Than This Proposal Uses
The property is zoned MU15, or Mixed-Use 15 Floors.
That sounds surprising when the proposal itself consists primarily of townhomes and detached houses. Everett’s comprehensive plan envisions this part of the city accommodating substantial mixed-use growth, and the zoning technically allows considerably more height and intensity than Rowan Park currently proposes.
City staff concluded that the lower-rise residential subdivision is still consistent with the comprehensive plan because the plan allows growth without requiring every property to immediately build to its maximum theoretical density.
In other words, this is not necessarily the most housing the zoning could support. It is the development proposal currently moving through review.
Affordable-Housing Rules Apply — but the Developer Is Using the Fee Option
The entire property falls within Everett’s Inclusionary Zoning Overlay. That means a residential project of this size has to address the City’s affordable-housing requirements.
The current Rowan Park staff report says the applicant has chosen Everett’s alternative fee-in-lieu option rather than meeting the requirement through affordable units within the subdivision. Under that route, the applicable fee is assessed as future building permits are submitted.
That is a meaningful detail because simply seeing that a project sits inside an inclusionary-zoning area does not necessarily mean a certain percentage of the homes will be sold at restricted prices. Everett’s code provides more than one way for a qualifying development to comply.
Why This Site Makes Sense for Housing
Big-box retail properties are unusually interesting redevelopment sites because they combine characteristics that are hard to assemble elsewhere: large contiguous parcels, existing utility infrastructure, arterial access, relatively flat ground, and very few existing residents who would have to be displaced.
The tradeoff is that they were usually designed for cars rather than neighborhoods.
Rowan Park therefore has to do more than demolish a Walmart and build houses. The site needs an internal circulation system, sidewalks, drainage, landscaping, open space, new lot lines, utility connections, and a more residential relationship with Evergreen Way.
That basic pattern is showing up elsewhere around the region. Our recent look at what is changing along Aurora Avenue covered the same larger question from a Seattle perspective: what happens when low-intensity or auto-oriented commercial land starts absorbing more of a region’s housing growth?
Evergreen Way Is Already in the Middle of a Broader Transition
Rowan Park is one project, but the Evergreen Way corridor is not standing still around it.
South Everett has a mix of older commercial centers, apartments, residential neighborhoods, industrial employment, Paine Field-related activity, and large parcels that were built for a different retail era. Everett’s long-range planning work is increasingly focused on how housing and mixed-use development fit along major corridors like Evergreen Way and Airport Road.
The City is also exploring future planning for the Airport and Evergreen Way urban center. That does not mean every shopping center will become housing, but it does put Rowan Park into a larger context: South Everett needs more homes, and some of its largest redevelopment opportunities are sites that were previously devoted almost entirely to retail buildings and parking.
The transformation will probably happen site by site rather than through one giant master plan.
A Neighborhood of Homes Could Feel Very Different From the Former Walmart
The obvious change is activity.
A Walmart generated heavy traffic during business hours, deliveries, shoppers moving in and out, and a large parking lot that was mostly empty overnight. A 248-home neighborhood would generate fewer shopping trips but much more continuous activity: residents leaving for work, children and pets outside, deliveries to individual homes, guests arriving in the evenings, and people walking between homes and Evergreen Way.
That shift from commercial activity to residential activity can also change how nearby properties experience the site. Instead of looking toward a giant building and parking field, some neighbors may eventually look toward rows of townhomes, detached houses, landscaping, and internal streets.
Whether that feels like an improvement will depend heavily on the individual property and final design. But the physical character of the site would be almost unrecognizable compared with the old Walmart.
Traffic Will Still Be One of the Questions to Watch
Adding 248 homes does not eliminate transportation impacts simply because the previous commercial use generated traffic too.
Evergreen Way is also State Route 99, so the project involves coordination with both Everett and WSDOT. City review calls for traffic-impact fees, frontage work, pedestrian improvements, and further transportation review through the public-works permit.
One interesting question is how the internal neighborhood ultimately connects westward. The City’s recommended conditions reference a future pedestrian and vehicle connection in the direction of Airport Road while also requiring access to existing commercial and utility properties to remain protected.
Those details matter because Rowan Park will work differently depending on whether most daily trips funnel toward one edge of the property or residents eventually have multiple practical ways in and out.
What Could Rowan Park Mean for Everett’s Housing Supply?
Two hundred forty-eight homes will not transform Snohomish County’s housing market by themselves. The county had nearly 3,000 active homes and condos for sale at the end of September, and the region needs housing on a much larger scale over the coming decades.
But developments like this matter cumulatively.
Rowan Park would add 248 ownership-style homes without removing an existing residential neighborhood. It would also introduce both attached and detached housing, creating options between a condominium or apartment and the larger detached homes that dominate many established suburban neighborhoods.
That type of housing can become especially relevant when affordability is constrained by both home prices and mortgage rates. As we discussed in the Seattle-Area Housing Market outlook for November 2026, buyers currently have more inventory to choose from, but financing costs remain a major hurdle. New supply does not solve affordability on its own, but the range of housing types matters.
This Is Different From Transit-Oriented Redevelopment — but the Pattern Is Familiar
Rowan Park is not a light-rail station project, and South Everett’s transportation context is different from places like Mountlake Terrace. Still, the underlying redevelopment pattern is recognizable.
Around Mountlake Terrace Town Center, land that once supported lower-intensity uses is being reconsidered as the region grows. The projects arrive individually, at different densities and on different schedules, but over time they create a different neighborhood.
Rowan Park could represent that kind of step for this part of Everett: one very large commercial parcel shifting permanently toward housing.
What Should Nearby Homeowners Watch Next?
The first thing to watch is the November 5 hearing and the Hearing Examiner’s decision. If preliminary subdivision approval is granted, the next phase will be much more technical: site-work permits, final subdivision requirements, landscaping revisions, utility work, and individual building permits.
The second question is timing. The current public record gives a clear picture of what the developer wants to build, but it does not yet give nearby residents a guaranteed construction start or completion date. Large subdivisions can move through site preparation and home construction in phases.
The third is the final site design. Details such as landscaping, sidewalks, access easements, internal circulation, stormwater systems, and the appearance of individual homes will become more concrete as the project moves into later permitting.
Frequently Asked Questions
Is Rowan Park approved?
Not yet. Everett planning staff is recommending approval with conditions, and a public hearing before the Hearing Examiner is scheduled for November 5, 2026. The Hearing Examiner makes the final preliminary-subdivision decision.
How many homes are proposed?
The current proposal includes 248 homes: 156 townhomes and 92 detached dwelling units.
Where would Rowan Park be built?
At 11400 Evergreen Way in Everett, on the former Walmart Supercenter property that closed in 2023.
How large is the property?
The site is about 18.9 acres in gross area. Everett staff identifies roughly 17 acres as net developable after critical areas and buffers are accounted for.
Would the old Walmart building remain?
No. The residential proposal is for redevelopment of the former Walmart site rather than reuse of the big-box building.
Will Rowan Park have apartments?
The current subdivision proposal is for townhomes and detached dwelling units, not a conventional apartment complex.
Will there be affordable homes in the development?
The property is within Everett’s Inclusionary Zoning Overlay, but the current staff report says the applicant has chosen the City’s fee-in-lieu compliance option rather than providing the required affordability through homes within the development.
Will there be parks or open space?
The plan includes private or shared yard areas for the homes plus more than 50,000 square feet of additional open space and recreation area.
When would construction begin?
The current land-use record does not establish a guaranteed construction-start date. Preliminary approval, site-work permitting, final subdivision review, and building permits still have to be completed.
The Bottom Line
Rowan Park would be a dramatic change for one of South Everett’s largest vacant retail sites.
Instead of one 149,000-square-foot store surrounded by parking, the current proposal would create 248 homes — 156 townhomes and 92 detached houses — along with private drives, sidewalks, landscaping, yards, drainage facilities, and more than 50,000 square feet of additional open and recreation space.
The project has advanced far enough that Everett planning staff is recommending approval with conditions, and the City has completed its SEPA review with a Determination of Nonsignificance. But the proposal is still moving through the land-use process, with the November 5 Hearing Examiner hearing as the next major step.
For nearby homeowners, the interesting part is bigger than the exact unit count. Rowan Park is an example of how South Everett may change as large auto-oriented commercial properties become potential housing sites. One vacant Walmart will not redefine Evergreen Way, but replacing nearly 19 acres of big-box retail with a new residential neighborhood would be a visible step in that direction.
For more local development and housing coverage, visit the North End Homes blog. You can also read our recent looks at Mountlake Terrace Town Center, changes along Aurora Avenue, and the Seattle-area November 2026 housing outlook.
If you are buying or selling in Everett or South Snohomish County, Chris Byler at Windermere Real Estate can help you look at how nearby development fits into the larger story for a specific property.






Comments